Representative Portfolio

What We Do

Hotel Casino

Golf Resort/Master Planned Communities

Commercial Shopping Centers

Single and Multi-family Housing

Utilities Power / Defense Engineering Infrastructure

Get a Quote For Your Project

Hotel Casino

Mirage, Rio, Paris and Venetian Resort Hotel Casino, the Halekulani Hotel and Forum Shops

Provided Investment, development and project management services to various large construction projects within the Las Vegas valley including management and consultant services for the Mirage Resort Hotel Casino, and the Rio Suite Hotel and Casino. Performed both project and construction management (phase 1 and 2) for the Forum Shops a 1.5 million square foot shopping complex at Caesar’s Palace. Finally, we have performed consultant services on various other projects, including the new Paris Hotel and Casino, the Halekulani Hotel in Hawaii, and the Venetian Resort Casino.

Golf Resort/Master Planned Communities

Rancho La Costa – 5000 Acre Master Planned Community

Provided Investment, development and project management for Rancho La Costa, a 5,000-acre master planned community located in Carlsbad, California, consisting of a major destination resort, championship golf course, residential, industrial and commercial mixed uses. Development included planning, design and construction of major roads and utilities infrastructure.

Commercial Shopping Centers

50 acre shopping center

Provided Investment, development and project management for North Mesa Plaza, a 50-acre, multiple-use commercial shopping center with two major tenants, Wal-Mart and Vons, located in Las Vegas, Nevada. Development required the interstate coordination of the users and consultants

Single and Multi-family Housing

Singles and Multi-family Housing

  • 320-unit Avalon at Seven Hills apartments
  • 489-unit Renaissance Vilas apartment
  • 336-unit San Tropez Condominiums
  • 352-unit San Croix Condominiums

Utilities Power / Defense Engineering Infrastructure

Santa Rosa Water Reclamation Facility

The Santa Rosa Water Reclamation Facility was constructed on a 1,000-acre site. The project utilizes the Sequencing Batch Reactor (SBR) technology to allow wastewater to be converted to reclaimed water through the multi-biological functions that occur within a single concrete tank that is housed indoors. This method of treatment utilizes less property for the primary stages of sewage treatment and eliminates impact to the community and the environment. This facility further refines the wastewater effluent through a tertiary level of treatment utilizing gravity-flow sand filtration to create a chlorinated reclaimed water product that is then distributed directly to irrigation systems within the community.

Contact Us

530 S Lake Ave, Unit 607 Pasadena, CA 91101

+1 (626) 592 7031

jc8innovation@gmail.com